Control Panel

Signal boxes and train control rooms originally used local control panels with buttons or switches to operate the signals and points. The switches and buttons were often positioned directly onto the track diagram on the panel. The buttons or switches controlled a relay or computer based interlocking.

Modern train controllers now use VDU displays in control rooms to control the Computer Based Interlockings via keyboard and mouse manipulations. 

» Web Rail Global Glossary

You are not logged in. (Log in)